        Fuding City Hospital Baisheng New area phase I

        Area:Fujian System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity:3575KW Heating Capacity:3711KW

        Project:

        Total cooling capacity: 3575kW; Total heat capacity 3711kW

        Installed Units:

        2X ERACS1702E-Q 2X ERACS1912EQB 2X ERACS2402E-Q 1X ERACS3622E-N-B

        Solution:

        Two four-pipe air-cooled heat pumps were used for simultaneous cooling and heating in the venous configuration center of the ward building, the COLD and heat source of ICU (non-surgical area), the emergency ICU of the medical Technology building, the emergency surgery department, the obstetrics department and the cold and heat source of NICU (non-surgical area). For the cold and heat source (operation area) of the surgical department and central supply room of the medical Technology building, two four-control air-cooled heat pump units are used for simultaneous cooling and heating, and one typhoon cold heat pump unit is used at the same time.

        Certification:

        Projects

        APPLICATION
        Projects

        Fuding City Hospital Baisheng New area phase I

        Area:Fujian System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity:3575KW Heating Capacity:3711KW

        Project:

        Total cooling capacity: 3575kW; Total heat capacity 3711kW

        System Type:

        Installed Units:

        2X ERACS1702E-Q 2X ERACS1912EQB 2X ERACS2402E-Q 1X ERACS3622E-N-B

        Solution:

        Two four-pipe air-cooled heat pumps were used for simultaneous cooling and heating in the venous configuration center of the ward building, the COLD and heat source of ICU (non-surgical area), the emergency ICU of the medical Technology building, the emergency surgery department, the obstetrics department and the cold and heat source of NICU (non-surgical area). For the cold and heat source (operation area) of the surgical department and central supply room of the medical Technology building, two four-control air-cooled heat pump units are used for simultaneous cooling and heating, and one typhoon cold heat pump unit is used at the same time.