        Beijing Benz Engine Factory no.2

        Area:Beijing System Type: Construction Area: Application Type:Industrial Process Cooling Capacity:3500kW Heating Capacity:

        Project:

        The second Beijing Benz Engine Plant adopts air-cooled chiller as the cooling capacity required by part of its buildings, with a total cooling load of 3500kW

        Installed Units:

        2X ERACS3602C-B 1X ERACS2652C-B "

        Solution:

        In order to ensure the ambient temperature required by the workshop, the project of Beijing Benz Engine Plant ii adopts air-cooled screw chiller to meet its refrigeration requirements.

        Certification:

        Projects

        APPLICATION
        Projects

        Beijing Benz Engine Factory no.2

        Area:Beijing System Type: Construction Area: Application Type:Industrial Process Cooling Capacity:3500kW Heating Capacity:

        Project:

        The second Beijing Benz Engine Plant adopts air-cooled chiller as the cooling capacity required by part of its buildings, with a total cooling load of 3500kW

        System Type:

        Installed Units:

        2X ERACS3602C-B 1X ERACS2652C-B "

        Solution:

        In order to ensure the ambient temperature required by the workshop, the project of Beijing Benz Engine Plant ii adopts air-cooled screw chiller to meet its refrigeration requirements.