        The Fourth Affiliated Hospital of Southern Medical University

        Area:Jiangsu System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity:6620kW Heating Capacity:7152kW

        Project:

        The New Branch of the Fourth Affiliated Hospital of Nanjing Medical University is located at No. 198, Nanpu Road, Jingxin Community, Yanjiang Street, Jiangbei New District, close to Liuzhou East Road Station of Metro Line 3, and 1914 Commercial Street in the west, covering an area of 129.7 acres and a construction area of 186,000 square meters. The project is a PPP project, with 800 beds in the first phase and a construction capital of 1.86 billion yuan. It is mainly divided into the outpatient emergency building (4 floors), inpatient building (15 floors), administrative building (4 floors), scientific research building (7 floors), and hospital sense building (1 floor).

        Installed Units:

        2×PSRHH4502C-Y-R 2× PSRHH4502C-Y Terminals

        Solution:

        Certification:

        Projects

        APPLICATION
        Projects

        The Fourth Affiliated Hospital of Southern Medical University

        Area:Jiangsu System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity:6620kW Heating Capacity:7152kW

        Project:

        The New Branch of the Fourth Affiliated Hospital of Nanjing Medical University is located at No. 198, Nanpu Road, Jingxin Community, Yanjiang Street, Jiangbei New District, close to Liuzhou East Road Station of Metro Line 3, and 1914 Commercial Street in the west, covering an area of 129.7 acres and a construction area of 186,000 square meters. The project is a PPP project, with 800 beds in the first phase and a construction capital of 1.86 billion yuan. It is mainly divided into the outpatient emergency building (4 floors), inpatient building (15 floors), administrative building (4 floors), scientific research building (7 floors), and hospital sense building (1 floor).

        System Type:

        Installed Units:

        2×PSRHH4502C-Y-R 2× PSRHH4502C-Y Terminals

        Solution:

        Certification: