• <small id="sss8s"><menu id="sss8s"></menu></small><sup id="sss8s"></sup>
    • <nav id="sss8s"><sup id="sss8s"></sup></nav>
      • 69堂在线观看线无码视频一,99精品人妻,淫色人妻网,人妻va精品va欧美va,超碰AV在线,亚洲av电影天堂网,亚洲?欧美?人妻,国产精品AV在线观看

        CLIMAVENETA

        Projects APPLICATION
        ? Location:Home>Projects
        CLIMAVENETA

        Guangzhou No.8 People's Hospital

        Area:Guangdong System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity:2400KW Heating Capacity:

        Project:

        Guangzhou No.8 People's Hospital adopts four control units and chillers, with a total cooling load of 2400KW.

        Installed Units:

        2 x CSRAN1062-Q-B-Y 1 x CSRAN1562-Q-B-Y 1 x ERACS1051C-B

        Solution:

        This system uses four control units and water chillers, including six hosts, and the terminal uses conventional terminal equipment.This system uses four control units and water chillers, including six hosts, and the terminal uses conventional terminal equipment.

        Certification:

        Projects

        APPLICATION
        Projects

        Guangzhou No.8 People's Hospital

        Area:Guangdong System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity:2400KW Heating Capacity:

        Project:

        Guangzhou No.8 People's Hospital adopts four control units and chillers, with a total cooling load of 2400KW.

        System Type:

        Installed Units:

        2 x CSRAN1062-Q-B-Y 1 x CSRAN1562-Q-B-Y 1 x ERACS1051C-B

        Solution:

        This system uses four control units and water chillers, including six hosts, and the terminal uses conventional terminal equipment.This system uses four control units and water chillers, including six hosts, and the terminal uses conventional terminal equipment.

        Certification: